Result 11 - 15 of 22
| ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI JUMLAH PRODUKSI SEBAGAI ALAT UNTUK MERAMALKAN JUMLAH PRODUKSI SEMEN GRESIK (SUATU USULAN MODEL) |
| Rusyidi Tri Suksesi (86410101033) |
| Pembimbing 1 : Ir. I Gede Arya Utama, M.MT. |
| Pembimbing 2 : Drs. A. Kuntjoro, M.Sc |
|
| RANCANG BANGUN PROGRAM SIMULASI Z-80 DENGAN MENGGUNAKAN BAHASA PEMROGRAMAN C |
| Shinta Kumalasari S. (86410101034) |
| Pembimbing 1 : Kartono, Drs.,MSc. |
| Pembimbing 2 : |
|
| ANALISIS OBJECT ORIENTED PROGRAMMING PADA EDITOR TURBO VISION |
| Andreanus Vincentius E. (86410101038) |
| Pembimbing 1 : Prasetija J. Kurniawan, Ir., MM |
| Pembimbing 2 : Andrea Djaja, BSc |
|
| PERENCANAAN DAN PEMBUATAN ROBOT YANG DIKENDALIKAN KOMPUTER IBM PC |
| Enjang Sasmita (86410101039) |
| Pembimbing 1 : Zainal Alim, Ir |
| Pembimbing 2 : Khakim Ghozali,Ir |
|
| SISTEM DATABASE YANG TERPADU DI OPERATION DEPARTMENT PADA PT. SIWI (USULAN MODEL) |
| Legeg Yanang Wiyanto (86410101048) |
| Pembimbing 1 : |
| Pembimbing 2 : |
|